Cascade Pacific Pulp, L.L.C. v. Georgia-Pacific Consumer Products, L.P.

Date: 11-14-2013

Case Number: A148782

Judge: Schuman

Court: Oregon Court of Appeals on appeal from the Circuit Court, Linn County

Plaintiff's Attorney: James T. Waldron argued the cause for respondent. With him on the brief were Sara C.

Cotton, Sara Kobak, and Schwabe, Williamson & Wyatt, P.C.

Defendant's Attorney: William F. Gary argued the cause for appellant. With him on the brief were Sharon A.

Rudnick, J. Aaron Landau, and Harrang Long Gary Rudnick PC. On the reply brief were

Willam F. Gary, Sharon A. Rudnick, and Harrang Long Gary Rudnick PC.

Description:
2 Plaintiff Cascade Pacific Pulp, LLC (Cascade) and defendant Georgia-

3 Pacific Consumer Products LP (Georgia-Pacific) are the present owners of adjoining

4 mills in Halsey, Oregon. The two mills, paper and pulp, were once part of an integrated

5 facility with a single owner, and they share a common infrastructure, including a water

6 treatment system and an effluent discharge system. After the two mills came under

7 separate ownership (by the parties' predecessors-in-interest), disputes arose concerning

8 the use of the shared infrastructure. The disputes were resolved in the early 1990s by

9 way of a settlement and operating agreement, an easement agreement, and a later

10 amendment to the easement agreement.

11 The present dispute between Cascade, which now owns the pulp mill, and

12 Georgia-Pacific, which owns the paper mill, concerns the interpretation and effect of the

13 easements and service rights granted in the early 1990s. Georgia-Pacific argues that, as

14 part of the settlement, its predecessor obtained express easements in the pulp mill's

15 process water and effluent lines, and that Cascade therefore is limited to charging cost16

based rates for the use of the shared system. Cascade, meanwhile, argues that the

17 easement agreements unambiguously do not grant Georgia-Pacific the easements and

18 service rights that it claims, thereby allowing Cascade to charge market-based rates for

19 the use of the pulp mill's process water and effluent lines. We agree with Cascade's

20 understanding of the easement agreements and therefore affirm.

21 I. BACKGROUND

2

1 A. History of the Mills

2 In 1968, American Can Company built a paper mill and a pulp mill in

3 Halsey. The mills were constructed as part of an integrated facility on a single site with a

4 common infrastructure. That infrastructure includes a water treatment system that draws

5 from the Willamette River and treats and transports millions of gallons of process water

6 each day for the two mills. The infrastructure also includes an effluent discharge system

7 that conveys treated effluent back to the river.

8 By the mid 1980s, American Can Company had sold its interests in the

9 mills. Pope and Talbot, Inc. (P&T) became the sole owner of the pulp mill by 1983, and

10 by 1986, James River Corporation (James River) had taken over the paper mill. In the

11 process, P&T and James River (or those parties' predecessors) had executed the Original

12 Easement Agreement, Amended Easement, and Necessary Services Agreement to ensure

13 that both mills continued to enjoy the use of the shared infrastructure. For a time, James

14 River managed operations at both mills despite their separate ownership, and P&T's pulp

15 mill sold process water and effluent discharge services to James River's paper mill

16 pursuant to the written agreements.

17 In 1989, P&T took over the operation of its pulp mill as the relationship

18 between P&T and James River turned acrimonious. Shortly after P&T took over the pulp

19 mill, James River announced plans to terminate its pulp purchases from P&T; James

20 River then terminated its contract to purchase steam from P&T. In response to those

21 terminations, P&T announced that it was terminating all other services sold to James

3

1 River as well, including the process water and effluent discharge services. The parties

2 then entered into tense negotiations to resolve their differences.

3 B. The Settlement and Easements

4 P&T and James River eventually settled their dispute with a series of

5 agreements that addressed, among other issues, use of and access to process water and

6 effluent discharge services. The documents memorializing their agreements--the 1991

7 Settlement and Operating Agreement, the 1991 Easement Agreement, and the 1993

8 Amendment--are at the center of this appeal.

9 1. The Settlement and Operating Agreement

10 In the Settlement and Operating Agreement (SOA), P&T and James River

11 agreed to terminate the previous Necessary Services Agreement and instead to share

12 services as provided in the SOA. Section 2.1 of the SOA ("Ongoing Necessary and

13 Shared Services") states:

14 "P&T shall provide the services specified in Schedule 2.1A ('Ongoing

15 Necessary Services'), the services specified in Schedule 2.1B ('Ongoing

16 P&T Shared Services') and steam, as described in Schedule 2.1C ('Ongoing

17 Steam Services'), to the Paper Facility, and [James River] shall provide the

18 services specified in Schedule 2.1D ('Ongoing JR Shared Services,' and

19 together with the Ongoing P&T Shared Services, 'Ongoing Shared

20 Services') to the Pulp Facility. Such services shall be provided by P&T and

21 [James River] in a manner consistent with the manner in which such

22 services are being provided as of the date hereof and shall be provided at

23 levels which are consistent with the historical consumption of such services

24 by the Paper Facility or the Pulp Facility, as the case may be, prior to the

25 date hereof * * *."

26 (Underscoring in original.) The levels of historical consumption were set forth in the

27 cross-referenced schedules, which also included descriptions of the particular services

4

1 within different categories. As pertinent here, the schedule for "Ongoing Necessary

2 Services," Schedule 2.1A, identifies two services: (1) "Effluent Line" and (2) "Process

3 Water." With respect to the effluent line, Schedule 2.1A states, "P&T maintains a

4 pipeline to transport treated effluent from its aeration ponds to the Willamette River.

5 [James River] will be permitted to run a pipeline from their secondary fiber plant and tie

6 it into P&T's existing pipeline for discharge of [James River's] effluent along with

7 P&T's." As for process water, Schedule 2.1A states, "A water filter plant and a filtered

8 water distribution system is operated for the use of the total Halsey plant site (the

9 combined Paper Facility and Pulp Facility)."

10 A different section of the SOA, Section 2.4 ("Compensation for Provision

11 of Services") establishes how much the parties will pay one another for the shared

12 services. Under paragraph (a) of that section, James River shall, on a monthly basis, "pay

13 to P&T an amount equal to the sum of (i) P&T's costs in providing each the immediately

14 preceding month (the 'Cost Portion'), plus (ii) an amount equal to 15% of such costs[.]"

15 (Underscoring in original.)

16 In addition to setting forth the shared services and costs for those services,

17 the SOA contemplated that the parties would execute easement agreements as part of the

18 settlement. Section 4.2 of the SOA states,

19 "Easement Agreements. P&T and [James River] agree that on the

20 Final Payment Date they shall enter into an Agreement of Easements and

21 Covenants, in substantially the form attached hereto as Exhibit C (the '1991

22 Easement Agreement'), pursuant to which the parties shall (i) evidence the

23 termination and supersession of the Original Easement Agreement, the

24 Easement Amendment and the Necessary Services Agreement and (ii) in

5

1 substitution therefor, grant certain new easement rights to the respective

2 parcels on which the Paper Facility and Pulp Facility presently sit. As

3 soon as practicable following the execution of the 1991 Easement

4 Agreement, P&T and [James River] shall jointly cause such document to be

5 recorded in the real property records of Linn County, Oregon."

6 (Emphasis added; underscoring in original.)

7 2. The 1991 Easement Agreement

8 As contemplated in the SOA, P&T and James River executed the 1991

9 Easement Agreement. The 1991 Easement Agreement provides that it is "being entered

10 into pursuant to, and to carry out the purposes of, the Settlement and Operating

11 Agreement * * *." Paragraph 1.G of the 1991 Easement Agreement further explains the

12 parties' intent:

13 "To permit the continued use and benefit by [James River], its

14 successors and assigns, of Parcel A [the paper mill] and the continued use

15 and benefit by P&T, its successors and assigns, of Parcel B [the pulp mill],

16 the parties have agreed that certain of the utilities, rights-of-way, parking,

17 storage and other uses of property appurtenant to Parcel A or Parcel B

18 utilized in connection with the operation of the pulp manufacturing and

19 paper manufacturing facilities located thereon continue to be available for

20 the respective owners of Parcels A and B."

21 Although the 1991 Easement Agreement conveys easements to both mills,

22 the easements at issue in this case are those conveyed by the pulp mill to the paper mill--

23 i.e., from P&T to James River. Those easements are found in paragraph 3 of the 1991

24 Easement Agreement, which concerns the interests that "P&T hereby grants and conveys

25 to [James River], for the benefit of [the paper mill]." They include:

26 "B. An easement over [the pulp mill] for the use of such electric

27 power, natural gas, liquid propane gas, process water, telephone and other

6

1 communications lines and storage facilities located thereon as presently

2 serve the business operations conducted [at the paper mill];

3 "* * * * *

4 "D. To the extent necessary to carry out the terms of Section 2.1 of

5 the [SOA], and only to such extent, an easement in the existing system for

6 the disposal of treated effluent located upon [the pulp mill], to use same to

7 discharge treated industrial effluent generated [at the paper mill];

8 "E. An easement and right to enter upon, traverse and occupy [the

9 pulp mill] in order to (1) install, repair, maintain, remove or replace

10 anything reasonably necessary to the proper operations and protection of

11 facilities located upon [the paper mill]; (2) install, repair, maintain, remove

12 or replace anything reasonably necessary to the proper construction,

13 operation and protection of fixed assets and facilities hereafter constructed

14 on [the paper mill]; and (3) install, repair, maintain or replace any of the

15 easements granted herein by P&T, provided that in no event shall such

16 easement constitute a right to use or have access to any facilities located on

17 [the pulp mill] necessary for the provision of steam or condensate return or

18 for the processing of broke;

19 "* * * * *

20 "H. A right of access over [the pulp mill] to the Willamette River

21 for the intake and discharge of water necessary to conduct business

22 operations [at the paper mill] as presently conducted[.]"

23 (Underscoring in original.) Paragraph 6 of the easement agreement then further qualifies

24 the effluent-related rights granted in paragraph 3.D, stating, "In the event that Section 2.1

25 of the [SOA] shall be amended, modified or terminated in any respect, the easements and

26 rights of user granted at Sections * * * 3.D. hereof shall be automatically amended,

27 modified or terminated to the same extent without any additional action on the part of the

28 parties to this Agreement."

29 As for costs, the 1991 Easement Agreement provides that, "[e]xcept as

30 otherwise contractually provided for between the then current owners of [the paper mill]

7

1 and [the pulp mill], costs of maintaining, repairing or replacing existing facilities

2 subjected to joint user hereunder shall be prorated between the users as the use of each

3 bears to the whole, and the costs of constructing and maintaining new facilities shall be

4 borne by the benefitted user."

5 3. The 1993 Amendment

6 In August 1991, as the parties were finalizing the SOA and 1991 Easement

7 Agreement, the attorney for P&T sent a letter to James River that broached the possibility

8 of creating a map to represent the various easements conveyed by the 1991 Easement

9 Agreement. The letter states,

10 "[P&T] has suggested that a map be prepared which shows the easements

11 and other benefits and burdens relating to the Halsey facility that are

12 presently covered by the Easement Agreement. They have begun

13 preparation of such a map. I suggest that, rather than formally attaching

14 the map to the new Easement Agreement to be executed, the two parties

15 execute a side letter agreement acknowledging the existence of the

16 easements as they are shown on the map."

17 (Emphasis added.)

18 And here is where much of this case hinges: the map. As it turned out, a

19 map of easements was not prepared until almost two years after the parties signed the

20 1991 Easement Agreement. In June 1993, P&T sent a letter to James River expressing

21 amazement at "how long it takes to get some things wrapped up!" The letter continued,

22 "Back on August 2, 1991 we signed the current agreements in effect

23 between James River and [P&T], including a copy (Exhibit C attached) of

24 the Easement Agreement. At that time we agreed to have all of the

25 easements documented on a facility map to simplify the understanding of

26 the easements by all parties involved. Well, the map reviewed by the

27 parties and put into final form is attached. Steve Tonsfeldt [attorney for

8

1 P&T] drafted an amendment which makes this map a part of the 1991

2 Agreements as Exhibit 'A.'

3 "Will you please sign the copies of the Amendment and return a full

4 set to me for our files and retain a set for your files. This should finalize

5 the 1991 Agreements."

6 James River signed the 1993 Amendment shortly thereafter. The 1993

7 Amendment stated, in relevant part:

8 "A. P&T and [James River] have each entered into that certain

9 Agreement of Easements and Covenants dated as of August 22nd, 1991

10 ('the 1991 Easement Agreement' attached hereto as Exhibit C) pursuant to

11 which P&T and [James River] each granted the other certain easements,

12 rights, benefits and burdens with respect to two adjacent parcels of land

13 located in Linn County, Oregon.

14 "B. Paragraphs 2 and 3 of the 1991 Easement Agreement set forth

15 certain of these easements, rights, benefits and burdens.

16 "C. P&T and [James River] now desire to amend such paragraphs to

17 provide for certain other easements, rights, benefits and burdens with

18 respect to such parcels of land.

19 "NOW, THEREFORE, in consideration of the foregoing, the parties

20 agree as follows:

21 "1. The original Paragraph 2 of the 1991 Easement Agreement is

22 hereby amended and restated to read in full as follows:

23 "'2. [James River] hereby grants and conveys to P&T, for the

24 benefit of [the pulp mill], those easements, rights, benefits and

25 burdens shown as being situated on the parcel owned by [James

26 River] on the map attached hereto as Exhibit A.'

27 "2. The original Paragraph 3 of the 1991 Easement Agreement is

28 hereby amended and restated to read in full as follows:

29 "'3. P&T hereby grants and conveys to [James River], for the

30 benefit of [the paper mill], those easements, rights, benefits and

31 burdens shown as being situated on the parcel owned by P&T on the

32 map attached hereto as Exhibit A.'"

9

1 (Underscoring omitted.)

2 The map referenced in and attached to the amendment is a schematic of the

3 two mills. It includes tags ("text tags") that identify rights-of-way and various easements

4 on the map, and below the text tags are small encircled numbers ("number tags"). By

5 way of illustration, the text-tag and number-tag combination appears something like this:

6

7

8

9 The number tags correspond to a section captioned "Notes" in the upper right corner of

10 the map. The "Notes" part of the map includes the following text:

11 "5. The Original Easement Agreement, the Easement Amendment

12 and the Necessary Services Agreement have been superseded in their

13 entirety by a settlement and operating agreement dated August 9, 1991

14 between [P&T] and James River Paper Company, Inc.

15 "The following references are detailed in the above agreement:

16 "* * * * *

17 "10 Ref. Page C-3, Paragraph 3B

18 "* * * * *

19 " Ref. Page C-4, Paragraph 3D

20 "* * * * *

21 " Ref. Page C-4, Paragraph 3H[.]"

22 (Uppercase omitted.) Three of the cross-referenced paragraphs--3B, 3D, and 3H--are the

23 paragraphs of the 1991 Easement Agreement that, as recited above, refer to effluent lines

16

0

1

0

12

10

0

1

0

EXISTING GAS &

TELEPHONE EASEMENT

(AGREEMENT LETTER

J.R.C. & P&T, INC.)

2 10

10

1 and process water.1

2 The wrinkle, however, is that not everything that was recited in the 1991

3 Easement Agreement appears on the map in a text tag or number tag. Moreover, the text

4 tags do not always describe everything that is cross-referenced in the accompanying

5 number tag. For instance, paragraph 3.B of the 1991 Easement Agreement (referenced in

6 number tag "10") grants the paper mill an easement over the pulp mill for the use of

7 "electric power, natural gas, liquid propane gas, process water, telephone and other

8 communications lines and storage facilities located thereon as presently serve the

9 business operations conducted on [the paper mill]." The text tag on the map that

10 accompanies number tag 10, however, refers to "existing gas & telephone easement"--

11 with no mention or depiction of process water lines. Likewise, paragraph 3.D of the 1991

12 Easement (referenced in number tag "12") grants the paper mill "an easement in the

13 existing system for the disposal of treated effluent," but the related text tag refers only to

14 "J. R. C. effluent monitoring bldg & effluent tie-in." The pulp mill's process water lines

15 and effluent discharge system are not otherwise delineated anywhere on the 1993 map.

16 C. The Present Dispute

17 1. Rejection of the SOA through bankruptcy

18 The discrepancies between the 1993 map and the 1991 Easement

19 Agreement apparently did not cause any trouble between James River and P&T,

1 Although the "above agreement" refers to the SOA, the 1991 Easement Agreement

was attached as an exhibit to the SOA.

11

1 presumably because the parties' relationship--and the cost of shared services between

2 them--was governed by the SOA. Circumstances changed, though, after P&T filed for

3 bankruptcy in 2007. During the bankruptcy proceedings, the U.S. Trustee rejected all of

4 P&T's executory contracts, including the SOA. Cascade, the plaintiff in this case, later

5 purchased the pulp mill out of that bankruptcy in 2008. The sale was expressly subject to

6 all easements of record, including the 1991 Easement Agreement, as amended in 1993,

7 but Cascade was not bound by the then-rejected SOA.

8 By the time that Cascade purchased the pulp mill, Georgia-Pacific, the

9 defendant in this case, had become the owner of the paper mill. Initially, Cascade

10 continued to provide Georgia-Pacific with access to and use of the shared facilities,

11 including process water at the same price specified in the SOA--cost plus 15 percent, or

12 approximately $.28 per hundred cubic feet (CCF)--even though the parties were no

13 longer bound by that agreement. In subsequent months, Cascade and Georgia-Pacific

14 attempted to negotiate terms to govern the price of shared services, but they were unable

15 to reach a new agreement. Then, in December 2008, Cascade imposed a price change for

16 process water, increasing the rate significantly--from $.28 per CCF to $2.10 per CCF.

17 2. Proceedings below

18 (a) Pleadings

19 Georgia-Pacific refused to pay the increased rate, and Cascade eventually

20 filed this action, alleging claims for breach of contract, account/services rendered,

12

quantum 1 meruit, and declaratory judgment.2 In the breach of contract claim, Cascade

2 alleged that Georgia-Pacific had accepted Cascade's services after December 1, 2008, and

3 had not paid the charged rates when payment was due. Cascade alleged that, as of

4 December 31, 2010, the amount owing was more than $3.4 million. The claims for

5 account/services rendered and quantum meruit alleged the same damages under different

6 theories.

7 In its fourth claim, Cascade sought a declaratory judgment. Cascade

8 alleged that a present controversy existed between Cascade and Georgia-Pacific "as to the

9 prices [Cascade] may charge [Georgia-Pacific] for services rendered." Cascade further

10 alleged that "[t]here is no agreement between the parties that limits [Cascade's] right, as

11 the supplier, to charge defendant commercial market prices for services rendered. Nor

12 does any agreement exist that dictates that [Cascade] shall only charge fees based on

13 actual costs of providing service." Accordingly, Cascade requested a declaration that

14 "[Cascade] may charge defendant commercial market prices for services and is not

15 limited to charging defendant based on actual costs to provide services."

16 Georgia-Pacific responded with nine counterclaims, only one of which is

relevant to our decision on appeal.3 17 Georgia-Pacific's fourth counterclaim requested a

2 Georgia-Pacific initially filed an action against Cascade in federal court but

voluntarily dismissed that action after Cascade filed this action in state court.

3 The remaining counterclaims included a claim seeking a declaration that Georgia-

Pacific "is required to pay only a reasonable rate for the services provided by Cascade

and that this rate should be based on Cascade's actual costs to provide such services";

breach of contract and declaratory judgment claims concerning amounts that Cascade had

13

1 declaration concerning various rights and obligations under the 1991 Easement

2 Agreement, as amended in 1993. The counterclaim alleged that Georgia-Pacific and

3 Cascade disagreed as to whether, by reason of the 1991 Easement Agreement and 1993

4 Amendment,

5 ï‚· Cascade is obligated to provide process water services to the paper

6 mill;

7 ï‚· Georgia-Pacific has the right to access the facilities located at the

8 pulp mill, including the Water Supply Treatment Facility, so as to

9 ensure the continued supply of the process water to the paper mill;

10 ï‚· Cascade may not interfere with Georgia-Pacific's use of the existing

11 lines that cross the pulp mill and other properties to convey treated

12 effluent to the Willamette;

13 ï‚· Georgia-Pacific has the right to access the existing pipes that cross

14 the pulp mill and other properties to ensure its ability to continue to

15 convey treated effluent to the Willamette; and

16 ï‚· In the event that Georgia-Pacific were to install a process water

17 treatment facility at the Paper Mill, Georgia-Pacific has the right to

18 access the existing pipes that cross the pulp mill and other properties

19 for the purpose of ensuring a water supply to the paper mill.

20 Georgia-Pacific asked the court to declare which of the parties' competing contentions in

21 those respects were correct.

22 (b) Trial court rulings and jury verdict

refused to pay for natural gas and security services, based on what Cascade believed to be

an appropriate setoff for process water and effluent discharge costs; claims requesting

that the court declare implied easements; a claim for breach of the covenant of good faith

and fair dealing; a claim for reformation of the 1993 Amendment and map; and a claim

requesting a declaration that Georgia-Pacific has an irrevocable license to access and use

the process water and effluent discharge systems.

14

1 The parties tried their claims and counterclaims simultaneously to the court

2 and the jury over six days. During that time, both parties presented evidence regarding

3 the history of the easement agreements between the mills. Cascade presented, among

4 other witnesses, Wayne Henneck, a former manager for P&T and the current CEO of

5 Cascade and general manager of its pulp mill. Henneck testified that he had assisted in

6 drafting the 1993 map by "help[ing] the drafts person locate some tags on the map but

7 that was it." He was not told the purpose of the references.

8 Georgia-Pacific did not call any of its own witnesses regarding the drafting

9 of the 1991 Easement Agreement or the 1993 Amendment. Rather, it recalled Henneck

10 to the stand, and he testified as follows:

11 "[HENNECK]: I helped the drafts person as to where the tags

12 should go on the map, and the -- the tags for the -- number 16 I think it was

13 in the lower left-hand corner for the river that you were focused on a

14 second ago, * * * it's been 20 years ago, but I specifically remember talking

15 about that location with the drafts person and where do you put it on the

16 map because the river is not on the map, so I thought, well, the river kind of

17 is down in this area over here so let's just put it there, and that's how it

18 ended up in that corner.

19 "[COUNSEL]: As opposed to where any easement to the river

20 might be?

21 "[HENNECK]: Right.

22 "[COUNSEL]: But beyond helping a draftsman put some tags on

23 the map you didn't know what the intent of the map was at the time, did

24 you?

25 "[HENNECK]: That's all I knew.

26 "[COUNSEL]: All you knew was you're supposed to help put some

27 tags on a map but you didn't know what it was about, what it was for?

15

1 "[HENNECK]: I didn't know the details behind it."

2 At the close of the evidence, the trial court determined which of the various

3 claims and counterclaims would be decided by the court, and which of them would be

4 sent to the jury. Ultimately, the trial court ruled that Georgia-Pacific's fourth

5 counterclaim, which sought declarations as to the rights and obligations of the parties

6 under the easement agreements, should be decided by the court. The court also decided

7 the merits of that counterclaim first, describing it as "really kind of the meat of it," which

8 "sort of drives the rest of the rulings, frankly, because they're all based on similar

9 theories."

10 In its oral explanation of its reasoning, the trial court remarked on various

11 aspects of the easement and settlement agreements, but we understand the court's analysis

12 to have turned on this inquiry: Which rights and obligations did the original parties, P&T

13 and James River, intend to "run with the land," and which did they intend to be

14 negotiated by successors in interest? In drawing a line between the two, the court noted

15 that "the effluent lines were handled a bit differently than everything else," in that the

16 easement rights were expressly tied to the terms of the SOA. The court explained that, as

17 a result of the bankruptcy proceeding, which relieved Cascade of the obligation to

18 perform under the SOA,

19 "there's an argument that the paper mill doesn't have the right to use the

20 effluent lines anymore pursuant to that one paragraph [paragraph 6] that

21 says that. It says that if the--if paragraph 2.1 of the S and O is cancelled or

22 whatever then--then the easement changes too as to the effluent line, so

23 that's another reason. And it doesn't all apply necessarily to the part of the

24 fourth counterclaim [that concerns the right to access the facilities at the

16

1 pulp mill, including process water] but it certainly explains the Court's

2 thinking on the whole nine yards."

3 The court then expanded on its reasoning:

4 "To summarize that thinking on the interpretation of all the documents and

5 history and everything else, yes, there are real estate easements which still

6 exist on the map there. Does everything on the map still exist? No. Just

7 the part of the things that would run with the land as anticipated by the

8 easement itself, not the kind of things that would be in the S and O

9 agreement necessarily between the two mills themselves that were personal

10 to them, would not necessarily run with the land. * * *

11 "* * * [I]t's clear to the Court that price, quantity, duty to supply,

12 those are gone, those no longer apply in this case. It gets a little bit trickier

13 when you get down to the point I raised with the attorneys when you were

14 arguing this morning, is, well, what about a shared pipeline, which there are

15 some here. You've got the real property easement per se saying that you

16 can use it, but to what extent, and do you have the right to interfere with the

17 other person's use * * *. [Georgia-Pacific will argue] they did raise * * *

18 right to access the existing pipes, not a real estate easement to run pipes but

19 the right to access the existing pipes, and that one, frankly--that one,

20 frankly is a liner for the Court based on my analysis that I just made about

21 the map. I guess I've got to make a choice and let the smart judges at the

22 Court of Appeals sort it all out later but I would say that one is--falls on the

23 S and O part, because under the S and O agreement that's where we get the

24 mutual 'we promise to supply' stuff, 'we promise to supply in this quantity,

25 at least this quantity and no more than that quantity,' you know, 'If you keep

26 doing your part we'll keep doing our part.' That seems like it falls on that

27 side of the line, that it's an S and O issue between those existing parties and

28 not necessarily something that would be--run with the land, perhaps the

29 right to run the pipe across the pulp mill to get to the river does not but the

30 use of the line."

31 (Emphasis added.)

32 After the court explained the basis for its ruling, Georgia-Pacific

33 specifically directed the court to paragraph 3.B of the 1991 Easement Agreement.

34 Georgia-Pacific explained that paragraph 3.B "does have a tag, or at least there is a

35 reference in the upper right-hand corner" of the 1993 map. Georgia-Pacific argued that

17

1 the paragraph directly undermined the court's line-drawing effort:

2 "[J]ust for the record, Your Honor, it seems to us that [the easement

3 described in paragraph 3.B] is an easement that runs with the land. * * *

4 [W]e've got the word 'the use of' and I don't know how that is something

5 that is limited to what happened in the Settlement and Operating

6 Agreement."

7 At that point, Cascade conceded that paragraph 3.B described easements

8 that would run with the land, but argued that all of original paragraph 3, including

9 paragraph 3.B, was "expressly deleted" from the 1991 Easement Agreement by the 1993

10 Amendment. The map was substituted in place of those sections, Cascade explained, and

11 the map, while mentioning existing gas and telephone easements, "does not refer to

12 processed water." The trial court then adhered to its previous ruling, stating, "I think

13 that's an open issue that I can't--I can't close in this case. * * * I appreciate the argument,

14 but * * * I'm still thinking I'm going to stick with where I'm at"--that is, ruling that

15 Georgia-Pacific does not have an easement in the existing facilities for process water or

16 effluent discharge.

17 Based on that analysis of the fourth counterclaim, which the court used as a

18 "springboard" for deciding other claims, the court resolved various other claims in favor

19 of Cascade and sent the remainder to the jury. As to the latter claims, the court instructed

20 the jury that, as a result of "the Court's rulings on the legal issues involved in the case[,]

21 the jury should not consider the [SOA] and the easements as controlling on the issue of

22 price of services, quantity for services, or the obligation to provide services between the

23 two mills[.]" The jury ultimately returned a verdict in favor of Cascade on its claim for

18

1 quantum meruit, determining that the reasonable value of the process water and effluent

2 discharge services was $1.60 per CCF. The jury either rejected or made no award with

3 regard to the other claims and competing counterclaims.

4 3. Issues on appeal

5 Georgia-Pacific appealed the ensuing judgment and now advances three

6 interrelated and alternative assignments of error: (1) The court erred in concluding that

7 the 1991 Easement Agreement, as amended in 1993, "does not unambiguously provide

8 [Georgia Pacific] with easement rights for access to and use of the facilities." (2)

9 Assuming there is some ambiguity in the 1991 Easement Agreement, as amended in

10 1993, the court erred in not submitting the meaning of the agreement to the jury. And

11 (3), assuming both that the agreement is ambiguous and that the ambiguity should have

12 been resolved by the court, the trial court applied the wrong interpretive methodology.

13 Cascade, for its part, argues that the 1991 Easement Agreement, as amended in 1993,

14 unambiguously does not give Georgia-Pacific any express easement or service rights in

15 Cascade's process water and effluent discharge systems; even assuming some ambiguity,

16 Cascade argues, "[Georgia Pacific] has not satisfied its burden to show that no evidence

17 in the record supports the trial court's explicit and implicit factual findings in resolving

18 such alleged ambiguities against [Georgia Pacific]."

19 II. ANALYSIS

20 The question before us is whether the trial court erred in concluding, as a

21 matter of law, that Georgia-Pacific does not have easement rights in the existing process

19

1 water lines and effluent discharge system located on Cascade's pulp mill. That question,

2 in turn, revolves around the interpretation of the 1991 Easement Agreement, as amended

3 in 1993. And, for the reasons that follow, we conclude that, based on the unambiguous

4 language of the easement agreements, the trial court correctly ruled that Georgia-Pacific

5 had no easement or service rights in the effluent discharge system or process water lines.

6 A. Applicable law

7 Although Georgia-Pacific suggests otherwise, the interpretation of an

8 express easement is a question of law to be decided by the courts. Bloomfield v.

9 Weakland, 224 Or App 433, 446, 199 P3d 318 (2008), rev den, 346 Or 115 (2009) ("The

10 interpretation of an express easement is a question of law for the court."). In construing

11 an easement, a court's task is to "discern the nature and scope of the easement's purpose

12 and to give effect to that purpose in a practical manner." Bloomfield, 224 Or App at 447.

13 The court must "look first to the words of the easement, viewing them in the context of

14 the entire document." Kell v. Oppenlander, 154 Or App 422, 426, 961 P2d 861 (1998).

15 The court is to consider the words of the agreement in the context of "'the circumstances

16 under which it was made, including the situation of the subject and of the parties * * * so

17 that the judge is placed in the position of those whose language the judge is interpreting.'"

18 Miller v. Jones, 256 Or App 392, 397, 302 P3d 812 (2013) (quoting ORS 42.220); see

19 also Connall v. Felton, 225 Or App 266, 272, 201 P3d 219, rev den, 346 Or 257 (2009)

20 ("To determine whether a term in a document is ambiguous, the court can consider

21 evidence of the circumstances surrounding its execution.").



20

If, after that inquiry, the court determines that the agreement's provisions

2 are ambiguous, extrinsic evidence of the surrounding circumstances can be used for a

3 slightly different aim: to resolve the ambiguity. See Tipperman v. Tsiatsos, 327 Or 539,

4 545, 964 P2d 1015 (1998) ("If the wording at issue is uncertain or ambiguous, then the

5 court must determine the intent of the original parties by examining the relevant

6 surrounding circumstances."). In this context, where a party requests a declaration as to

7 the existence and scope of an easement, it is the court--not the jury--that considers that

8 extrinsic evidence and resolves any factual disputes as to that evidence. E.g., Tipperman,

9 327 Or at 545. If, after considering extrinsic evidence, the court still is unable to resolve

10 the ambiguity, the court employs any relevant maxims of construction. Id. (explaining

11 that a maxim of construction should have been used to resolve the interpretation of an

12 easement agreement only if "any ambiguity * * * remains after all other tools for

13 resolving it have failed").

14 B. The 1991 Easement Agreement, as Amended in 1993

15 In its briefing to this court, Georgia-Pacific combines its discussion of

16 easements related to the effluent discharge system and process water under a single rubric

17 ("access to and use of the Facilities"). However, because the easement agreements treat

18 process water and effluent discharge differently, we elect to discuss them separately.

19 1. Process water lines

20 Georgia-Pacific's claim to an easement in the pulp mill's process water lines

21 derives from language in "original Paragraph 3 of the 1991 Easement Agreement"--

21

specifically, 1 paragraph 3.B, which granted an easement "over Parcel B [the pulp mill] for

2 the use of such electric power, natural gas, liquid propane gas, process water, telephone

3 and other communication lines and storage facilities located thereon as presently serve

4 the business operations conducted on the Parcel A [the paper mill.]" (Emphasis added.)

5 Although Cascade contends that paragraph 3.B should be understood as conveying an

6 easement in a strip of land, and not as an easement in the lines themselves, we are not

7 persuaded by that argument. The plain text of the paragraph grants an easement over the

8 pulp mill "for the use" of process water, which, in the broader context of the relationship

9 between the two mills, could be understood as referring to an easement in the shared

10 process water facilities, as Georgia-Pacific contends.

11 The problem for Georgia-Pacific, however, is that original paragraph 3 of

12 the 1991 Easement Agreement is no longer an operative provision of that agreement.

13 Although there is extrinsic evidence that suggests that the 1993 Amendment by James

14 River and P&T was intended merely "to have all of the easements documented on a

15 facility map to simplify the understanding of the easements by all parties involved," that

16 purported intent is not borne out in the text of the 1993 Amendment itself. See Minto v.

17 Salem Water Etc. Co., 120 Or 202, 210, 250 P 722 (1926) (extrinsic evidence cannot be

18 used to contradict unambiguous language; "[i]t is the duty of the court to declare the

19 meaning of what is written in the instrument, not of what was intended to be written").

20 Rather, the recitals in the 1993 Amendment state that "P&T and [James River] now

21 desire to amend [paragraphs 2 and 3 of the 1991 Easement Agreement] to provide for

22

1 certain other easements, rights, benefits and burdens with respect to such parcels of

2 land." (Emphasis added.) The 1993 Amendment then expressly states that "original

3 Paragraph 3 of the 1991 Easement Agreement is hereby amended and restated to read in

4 full" as follows:

5 "'3. P&T hereby grants and conveys to [James River], for the benefit

6 of Parcel A, those easements, rights, benefits and burdens shown as being

7 situated on the parcel owned by P&T on the map attached hereto as Exhibit

8 A.'"

9 (Emphasis added.) Thus, as of 1993, the provisions of original paragraph 3--including

10 paragraph 3.B--were unambiguously replaced by the new paragraph 3, which set forth

11 "other" easements. The "other" easements granted by P&T under that new paragraph

12 were limited to "those easements, rights, benefits and burdens shown as being situated on

the parcel owned by P&T on the map attached hereto * * *." (Emphasis added.)4 13

14 The question, then, reduces to whether an easement in the process water

15 lines is "shown as being situated" on the pulp mill on the 1993 map. It is undisputed that

16 the process water lines themselves are not depicted anywhere on the 1993 map. (In its

4 Based on extrinsic evidence and the "Notes" section of the map, which crossreferences

many of the paragraphs in the 1991 Easement Agreement, Georgia-Pacific

initially argues that "[t]he express easement rights granted under the 1991 Easement

Agreement are, in letter and in substance, unchanged by the 1993 Amendment to that

Agreement"--i.e., Georgia-Pacific argues that the map simply restates and incorporates

everything in the 1991 Easement Agreement. Again, while there is extrinsic evidence

that is consistent with that view, it simply does not square with the text of the 1991

Amendment or the face of the map. Although the Notes section of the map crossreferences

most of the paragraphs of the 1993 Easement Agreement, two paragraphs--2.E

and 3.E--are not cross-referenced at all. Given the text of the 1993 Amendment and the

map, the Notes section cannot plausibly be read as incorporating, verbatim, the text and

substance of the entire 1991 Easement Agreement.

23

reply brief, Georgia 1 -Pacific notes that the "map's illustration of the grounds mysteriously

2 omits the water facilities themselves.") Nor is there a text tag anywhere on the map that

3 refers directly to the pulp mill's process water lines. The only possible reference to an

4 easement in the pulp mill's process water lines is by way of a number tag--"10"--that

5 appears on the map under the text tag, "Existing gas and telephone easement (Agreement

6 letter J.R.C. & P&T, Inc.)." See ___ Or App at ___ (slip op at 9) (showing that tag

7 combination). Number tag 10 corresponds to paragraph 3.B--the superseded provision of

8 original paragraph 3 that concerned process water, among other things.

9 Viewed in context, however, that number tag does not plausibly incorporate

10 the entirety of original paragraph 3.B, which would include easement rights that do not

11 otherwise appear anywhere on the 1993 map. Again, the text of the 1993 Amendment

12 conveys only those easement rights "shown as being situated on the parcel owned by

13 P&T on the map," and there is nothing on the map that shows or even suggests where a

14 process water system might be situated on the pulp mill. The only plausible purpose of

15 the number tag, in context, is to further detail those easements that are shown as being

16 situated on the map: the existing gas and telephone easements described in the

17 accompanying text tag. Easements over gas and telephone lines, like process water, were

18 described in original paragraph 3.B, and the cross-reference can only plausibly be

19 understood to refer back to the part of paragraph 3.B pertaining to gas and telephone

20 lines, as shown on the map. Thus, we agree with Cascade that the 1991 Easement

21 Agreement, as amended by the 1993 Amendment, unambiguously does not encompass

24

1 easement rights in the pulp mill's existing process water lines.5

2 2. Effluent discharge system

3 The effluent discharge system, as the trial court observed, was treated

4 differently from other easements in the 1991 Easement Agreement. And, unlike the

5 purported easements in the process water system, there is at least a plausible argument

6 that the 1993 map depicts easement rights in the effluent discharge system itself. The

7 map contains a text tag that refers to "J.R.C. effluent monitoring bldg & effluent tie-in,"

8 which is accompanied by two related number tags, "4" and "12." Tag 4 cross-references

9 a paragraph conveying easement rights to the pulp mill, but tag 12 cross-references

10 paragraph 3.D of the 1991 Easement Agreement, which granted the paper mill "an

11 easement in the existing system for the disposal of treated effluent" to "the extent

12 necessary to carry out the terms of Section 2.1 of the [SOA], and only to such extent[.]"

13 Read together, and in the broader context of the parties' relationship, the text and number

14 tags on the map arguably show the paper mill's easement rights in the pulp mill's effluent

15 discharge system.

16 However, as the trial court correctly noted, the 1991 Easement Agreement,

17 as amended, put express limitations on those easement rights. Section 6.1 of the 1991

5 There is a text tag on the map that refers to "JR Access to Willamette River for

Intake and Discharge of Water," along with a number tag that cross-references paragraph

3.H of the 1991 Easement Agreement. Georgia-Pacific does not develop any argument

regarding that text, which appears to grant only a right to access the river, and not

easement or service rights in the existing facilities themselves. Accordingly, we do not

discuss it further.

25

1 Easement Agreement, which was not amended in 1993, provides, "In the event that

2 Section 2.1 of the Settlement and Operating Agreement shall be amended, modified or

3 terminated in any respect, the easements and rights of user granted at * * * Section 3.D

4 hereof shall be automatically amended, modified or terminated to the same extent without

5 any additional action on the part of the parties to this Agreement." (Emphasis added.)

6 There is no dispute on this record that, as of the U.S. Trustee's rejection of

7 the SOA during P&T's bankruptcy, Cascade, the owner of the pulp mill, is not bound by

8 Section 2.1 of the SOA and has no obligation to supply shared services--including

9 effluent discharge services--under that provision of the SOA. See 11 USC § 365(g)

10 (authorizing the trustee to "assume or reject any executory contract or unexpired lease of

11 the debtor," subject to certain conditions). The trial court reasoned, and Cascade now

12 argues, that any potential easement in the effluent discharge system was terminated along

13 with the U.S. Trustee's rejection of the SOA.

14 In response to that contention, Georgia-Pacific argues that Cascade

15 misstates the effect of a trustee's rejection of a contract under the bankruptcy code.

16 Georgia-Pacific contends that "[r]ejection is no more than the trustee's decision not to

17 make the estate a party to the executory aspects of one of the debtor's contracts--just as

18 any third party can decide not to assume another party's contractual obligation." In

19 Georgia-Pacific's view, the trustee's decision not to assume the SOA had no effect

20 whatsoever on the existence of the contract and its obligations.

21 We appreciate that, in other contexts, a trustee's rejection of the SOA will

26

1 not be treated as a termination of the contract. Here, however, there is no dispute that,

2 after Cascade purchased the pulp mill out of bankruptcy, the SOA no longer governed the

3 rights and obligations between the owner of the pulp mill and the owner of the paper mill.

4 The 1991 Easement Agreement, as amended in 1993, conveyed, at most, easement rights

5 in the effluent discharge system to "the extent necessary to carry out the terms of Section

6 2.1 of the [SOA], and only to such extent[.]" (Emphasis added.) That provision, coupled

7 with the automatic modification/termination provision in Section 6 of the agreement,

8 leaves no doubt that the original parties to the agreements intended to couple whatever

9 rights were being conveyed in the effluent discharge system with Section 2.1 of the SOA.

10 In these circumstances, we conclude that, as a consequence of the bankruptcy process, the

11 SOA was terminated for purposes of Section 6 of the agreement: Section 2.1 no longer

12 governed the rights and obligations of the pulp mill and paper mill. Indeed, Georgia-

13 Pacific does not explain why, now that the terms of Section 2.1 of the SOA are no longer

14 being carried out at all, the paper mill nevertheless has easement rights to "the extent

15 necessary to carry out the terms of Section 2.1 of the [SOA]." Thus, we agree with the

16 trial court's conclusion that Georgia-Pacific does not have easement rights in Cascade's

17 effluent discharge system.

18 In sum, we conclude that the 1991 Easement Agreement, as amended in

19 1993, unambiguously does not grant Georgia-Pacific any easement rights in Cascade's

20 process water lines; we further conclude that, even if the easement agreements could be

21 read to grant Georgia-Pacific easement rights in the existing effluent discharge system,

27

1 those easement rights did not survive P&T's bankruptcy proceedings. We therefore reject

2 each of Georgia-Pacific's assignments of error and affirm the judgment in favor of

3 Cascade.

Outcome:
4 Affirmed.
Plaintiff's Experts:
Defendant's Experts:
Comments:

About This Case

What was the outcome of Cascade Pacific Pulp, L.L.C. v. Georgia-Pacific Consumer ...?

The outcome was: 4 Affirmed.

Which court heard Cascade Pacific Pulp, L.L.C. v. Georgia-Pacific Consumer ...?

This case was heard in Oregon Court of Appeals on appeal from the Circuit Court, Linn County, OR. The presiding judge was Schuman.

Who were the attorneys in Cascade Pacific Pulp, L.L.C. v. Georgia-Pacific Consumer ...?

Plaintiff's attorney: James T. Waldron argued the cause for respondent. With him on the brief were Sara C. Cotton, Sara Kobak, and Schwabe, Williamson & Wyatt, P.C.. Defendant's attorney: William F. Gary argued the cause for appellant. With him on the brief were Sharon A. Rudnick, J. Aaron Landau, and Harrang Long Gary Rudnick PC. On the reply brief were Willam F. Gary, Sharon A. Rudnick, and Harrang Long Gary Rudnick PC..