Gerald A. Lechliter v. Del. Department of Natural Resources & Environmental Control, et al.

Date: 01-01-2016

Case Number: 7939-VCG

Judge: Sam Glasscock III

Court: IN THE COURT OF CHANCERY OF THE STATE OF DELAWARE

Plaintiff's Attorney: Dan McKenty, Mike Mitchell

Defendant's Attorney: Ralph K. Durstein, III, Devera B. Scott, William J. Kassab

Description:
The Plaintiff filed his Verified Complaint on October 11, 2012. The

Complaint alleged seven counts against the Defendants: Count I alleges that DNREC

violated numerous statutes to illegally build the Turbine; Count II alleges that the

City violated statutes and zoning ordinances to illegally issue the Building Permit;

Counts III and IV allege violations of the Delaware Freedom of Information Act

(“FOIA”) against DNREC and the City, respectively; Count V alleges that DNREC

allows selected individuals to hunt illegally; Count VI alleges that the Defendants

committed nine torts in the construction and operation of the Turbine; and Count VII

alleges that DNREC and UD acted with gross and wanton negligence by approving

UD’s realignment of the Connector Road. In addition, the Plaintiff alleges that

DNREC conspired with UD, Gamesa, Blue Hen, and First State to perform the

wrongs alleged in Count I; similarly, the Plaintiff alleges that the City conspired with

the UD Defendants to perform the wrongs alleged in Count II.

In relief, the Plaintiff seeks numerous declaratory judgments and various

forms of injunctive relief, including the removal of the Turbine, as well as damages.

On June 24, 2013, I granted the parties’ Stipulation to Stay the Case pending

the resolution of a related federal action, also brought by the Plaintiff, which

41 Id. at ¶¶ 200–17.

12

“involve[ed] the same universe of alleged facts underlying [] this action.” On

October 10, 2013, Plaintiff filed a Motion for Temporary Restraining Order to

prevent construction of the Connector Road, which I denied via Letter Opinion of

October 22, 2013.42

On January 16, 2015, the District Court granted the defendants’ motion to

dismiss and on January 28, I granted Plaintiff’s Motion to Lift Stay of Proceedings.

On April 2, 2015, the City/UD Defendants filed a Motion for Summary

Judgment. On April 6, 2015, the DNREC Defendants filed a Motion to Dismiss.

The parties submitted briefing on both Motions in June and July. I heard oral

argument on September 4, 2015. This is my Memorandum Opinion.

III. STANDARD OF REVIEW

The Defendants filed two dispositive motions in response to the Plaintiff’s

claims. The City/UD Defendants filed a Motion for Summary Judgment on Counts

I, II, IV, VI, and VII. The DNREC Defendants filed a Motion to Dismiss Counts I,

III, V, VI, and VII under Court of Chancery Rule 12(b)(6), for “failure to state a

claim upon which relief can be granted.” However, the DNREC Defendants’

opening brief and the Plaintiff’s answering brief cited evidence that was not included

in the Plaintiff’s Complaint. Moreover, the City/UD Defendants moved for

summary judgment on many of the same counts. All of the parties, including the

42 Lechliter v. DNREC, 2013 WL 5718888 (Del. Ch. Oct. 22, 2013).

13

Plaintiff, have been given ample opportunity to supplement the record and I find that

none of the parties would be prejudiced by an application of the standard applicable

to a motion for summary judgment. In light of the foregoing, I convert the DNREC

Defendants’ Motion to Dismiss to a Motion for Summary Judgment,43 thus applying

the applicable standard to all of the Plaintiff’s Counts, as set forth below.

Summary Judgment should be granted where, considering the facts in the light

most positive to the non-moving party, the moving party has established that “there

is no genuine issue as to any material fact and that the moving party is entitled to a

judgment as a matter of law.44

IV. ANALYSIS

The Plaintiff’s Complaint asserts a slew of claims against the Defendants,

both individually and as a part of a conspiracy. Col. Lecliter is an intelligent man,

articulate in written and oral communication. He is not legally trained, however,

and has taken the opportunity here to complain of the actions of the Defendants in

ways that sometimes approach the border between creative and frivolous. As a

result, my analysis below is necessarily45 an inelegant dog’s breakfast, the episodic

treatment of claims in which will no doubt try the reader’s patience. Because of the

43 See In re Gen. Motors (Hughes) S’holder Litig., 897 A.2d 162, 168–69 (Del. 2006). 44 Ct. Ch. R. 56(c). 45 Necessarily, that is, given not only the nature of the action, but also this judge’s limitations as a writer.

14

idiosyncratic organization and presentation of the Complaint, I have found it difficult

to determine precisely what causes of action the Plaintiff asserts. I limit my analysis

here to those claims that have been clarified in the briefing or at oral argument; all

remaining allegations not briefed or otherwise explained are considered waived.46

A. Claims Against DNREC for Granting the Original Easement

In Count I, the Plaintiff alleges that the Original Easement granted in 2002

represents “a misuse of taxpayer dollars,” and argues that the use prescribed therein

did not conform to any of the purposes enumerated in the Delaware Land

Preservation Act (the “DLP Act”) for which DNREC can acquire real property.47

Additionally, the Plaintiff points to 29 Del. C. § 9403 and argues that DNREC lacked

the power to grant the Original Easement because the Director of the Office of

Management and Budget has been given the sole authority to grant easements.48 In

46 See In re Crimson Exploration Inc. S’holder Litig., 2014 WL 5449419, at *26 (Del. Ch. Oct. 24, 2014) (waiving the plaintiffs’ claim where they “did not mention [the claim] in their Opposition Brief or at the Argument”) (citing Emerald Partners v. Berlin, 2003 WL 21003437, at *43 (Del. Ch. Apr. 28, 2003) (“It is settled Delaware law that a party waives an argument by not including it in his brief.”)). 47 Specifically, 7 Del. C. § 7503(a) provides the following: State agencies may acquire any interest in real property for the following purposes . . . : (1) To protect and conserve all forms of natural and cultural resources; (2) To protect and conserve the biological diversity of plants and animals and their habitat; (3) To protect existing or planned parks, forests, wildlife areas, nature preserves or other recreation, conservation or cultural sites by controlling the use of contiguous or nearby lands; (4) To preserve sites of special natural, cultural or geological interest; (5) To connect existing open spaces into a cohesive system of greenways and resource areas; (6) To provide for public outdoor recreation; and (7) To allow for water resource conservation. 48 29 Del. C. § 9403 states: “For purposes of this chapter the granting of an easement shall not be considered a conveyance of real property. The determination to grant an easement shall be at the discretion of the Director of the Office of Management and Budget” (emphasis added).

15

response, DNREC argues that all claims concerning the Original Easement should

be time-barred under the doctrine of laches.

The doctrine of laches supports denial of a plaintiff’s request for equitable

relief when the plaintiff has unreasonably delayed in seeking that relief, and such

delay has prejudiced the defendant.49 DNREC asserts that the Plaintiff’s allegations

regarding the Original Easement are time-barred because the Plaintiff’s Complaint

was filed after the analogous three-year statute of limitation for actions “based on a

statute,” as provided in 10 Del. C. § 8106(a). Although the statute of limitation does

not strictly bind a court in equity in a laches analysis, the statute will ordinarily bar

a claim unless the plaintiff can show the existence of “unusual conditions or

extraordinary circumstances.”50 Here, the Plaintiff contends unusual facts and

circumstances exist that justify the tolling of his claims, because he was unaware of

the Original Easement in 2002, because the 2002 deed “makes no mention of any

easements,” and because there is “no evidence that these easements were referred to

the OS Council for advice and consultation.”51 Ultimately, the Plaintiff urges me to

find that his claims are not barred because he filed his Complaint “well within [two]

years of discovering [the Original Easement] through a FOIA request.”52

49 See Reid v. Spazio, 970 A.2d 176, 182 (Del. 2009); Martin v. Med-Dev Corp, 2015 WL 6472597, at *15 (Del. Ch. Oct. 27, 2015) (citing U.S. Cellular Inv. Co. v. Bell Atlantic Mobile Sys., Inc., 677 A.2d 497, 502 (Del. 1996)). 50 See Reid, 970 A.2d at 184 (citing Wright v. Scotton, 121 A. 69, 72–73 (Del. 1923)). 51 Pl.’s Answering Br. 64–65. 52 Id. at 65.

16

The Plaintiff’s argument is not persuasive, however. The Original Easement

provided that the University could continue using the Encumbered Land for the

disposal of dredge spoils, which the Complaint itself avers that the University did

for seven years before the Plaintiff filed his Complaint. It is clear that there was no

attempt to conceal the fact or effect of the University’s retention of the Original

Easement.

The Plaintiff has failed to allege any additional facts to establish unusual or

extraordinary circumstances that would justify tolling his claims beyond the

statutory time limitations, and his claims are therefore barred by laches. As a result,

I grant summary judgment in favor of the Defendants for the claims in Count I that

allege violations of statutes arising from the grant of the Original Easement. Because

of this decision, I need not reach the Defendants’ argument that the Plaintiff lacks

standing to proceed on this claim. However, I note that even if this claim was not

time-barred, the Original Easement was a part of the purchase transaction itself, and

thus did not involve the disposition of public lands, or the granting of an easement

thereon; accordingly, the Plaintiff’s claims are without merit.53

53 The Plaintiff supposes, erroneously in my view, the existence of a brief moment in time, between the purchase of the Lewes Property and the grant of the Original Easement, where the Encumbered Land became protected under the DLP Act. Therefore, the Plaintiff alleges that the grant of the Original Easement converted the permanently protected status of the parcel, in violation of the DLP Act. However, the Original Easement was contemplated to be included as consideration for the purchase of the Lewes Property, and the transfer of the Lewes Property to, and the grant of the easement from, DNREC were virtually simultaneous. Consequently, I deem the purchase and grant a single, simultaneous transaction. The Encumbered Land was never subject to the strictures

17

B. Claims Against DNREC Concerning the DNREC-MOU and the Amended Easement54

In Count I of the Complaint, the Plaintiff alleges that DNREC acted ultra vires

when it approved the DNREC-MOU in October 2009 and also when it amended the

Original Easement in February 2010. The Plaintiff argues that in each instance

DNREC violated numerous statutes because it failed to take mandated prerequisite

action before entering these agreements.

The DNREC Defendants argue that the Plaintiff’s claims based on alleged

statutory violations should be rejected because the Plaintiff lacks standing to bring

his claims. A private individual has a right of action under a statute, in general, only

where the statute so provides.55 An exception exists where a plaintiff has suffered

an injury-in-fact as a result of the statutory violation, and the interest damaged is

within the “zone of interest” addressed by the statute; in other words, where the

plaintiff has suffered a concrete injury of the type the statute was intended to prevent.

The Plaintiff does not point to any statute itself to confer a private right of action to

seek review of the alleged violations; instead, the Plaintiff argues that he has

standing because DNREC’s statutory violations caused him to suffer an injury. In

of the DLP Act, and was therefore not subject to the provisions that the Plaintiff argues DNREC violated here. 54 In this section, I consider only the claims against DNREC, individually. The Plaintiff’s related conspiracy claims are analyzed together and discussed elsewhere. 55 See Oceanport Indus. v. Wilmington Stevedores, Inc., 636 A.2d 892, 900 (Del. 1994) (“[N]o party has a right to appeal unless the statute governing the matter has conferred the right to do so.”).

18

addition, the Plaintiff argues that he has taxpayer standing to challenge the grant of

the easements.56 I analyze each of the Plaintiff’s standing arguments in turn and find

that the Plaintiff lacks individual standing, but that the Plaintiff has taxpayer

standing to bring claims concerning the Amended Easement.

1. Individual Standing

This Court applies the “concept of standing as a matter of self-restraint to avoid

the rendering of advisory opinions at the behest of parties who are mere

intermeddlers.”57 The plaintiff bears the ultimate burden of establishing standing to

bring a claim.58 Where, as is the case here, the plaintiff has not alleged that a statute

expressly provides standing, the plaintiff may establish standing by meeting a two

part test. First, the plaintiff must demonstrate the he has suffered an “injury-in-fact”;

second, the plaintiff must demonstrate that the interest he seeks to protect is within

the zone of interest to be protected by the statute in question.59 The Delaware

Supreme Court has held that this test entails the following inquiry:

(1) [T]he plaintiff must have suffered an injury in fact-an invasion of a legally protected interest which is (a) concrete and particularized and (b) actual or imminent, not conjectural or hypothetical; (2) there must be a causal connection between the injury and the conduct complained of—the injury has to be fairly traceable to the challenged action of the 56 Pl.’s Answering Br. 34–40. 57 Dover Historical Soc. v. City of Dover Planning Com’n, 838 A.2d 1103, 1111 (Del. 2003) (quotation omitted). Federal courts apply a similar requirement due to their jurisdictional limits under Article III of the United States Constitution. 58 Id. at 1109. 59 O’Neill v. Town of Middletown, 2006 WL 205071, at *28 (Del. Ch. Jan. 18, 2006) (citing Dover Historical Soc., 838 A.2d at 1110).

19

defendant and not the result of the independent action of some third party not before the court; and (3) it must be likely, as opposed to merely speculative, that the injury will be redressed by a favorable decision.60

Finally, in order to establish standing, the plaintiff’s “interest in the controversy must

be distinguishable from the interest shared by other members of a class or the public

in general.”61

In Count I of the Complaint, the Plaintiff does not allege a particular injury,

but instead relies solely on the contention that the alleged statutory violations have

caused him “tort damages.”62 In the Plaintiff’s answering brief, he argues that he

has sufficiently plead an injury to establish standing by pointing to the following

injuries:

“Turbine proximity, noise, proximity to the walkway on which he regularly walks, loss of property and aesthetic value, and UD’s denial of [the Plaintiff’s] access to land purchased for permanent preservation as Open Space.”63

The Plaintiff also alleges that he has suffered adverse “health effects.”64 For the

purpose of assessing standing in Count I, I will assume that these alleged injuries are

those alleged as “tort damages” in his Complaint. I note that the aesthetic and access

damages are shared with the public at large, and cannot support an injury-in-fact,

60 Id. (citing Dover Historical Soc., 838 A.2d at 1110). 61 Stuart Kingston, Inc. v. Robinson, 596 A.2d 1378, at 1382 (Del. 1991) (citation omitted). 62 Compl. 56. 63 Pl.’s Answering Br. 40. 64 Id.

20

but, since the Plaintiff has alleged in the record both personal injury and damage to

his property value as a result of the operation of the turbine, I will consider those the

injury alleged here.

The first statutory violation alleged by the Plaintiff is that DNREC violated the

DLP Act because it failed to consult with the OSC before approving the DNREC

MOU and before granting the Amended Easement. The DLP Act, at 7 Del. C. §

7506(6), provides that the OSC shall “[a]dvise and consult regarding any change

from permanently protected status of open space lands acquired or otherwise

protected.” Plaintiff asserts that DNREC was required to consult the OSC here

because the DNREC-MOU and the Amended Easement changed the status of the

Encumbered Land from permanently protected status.65 The Plaintiff alleges that

DNREC’s failure to consult the OSC has caused him tort damages, presumably to

his health and property values.

Second, the Plaintiff argues that DNREC violated statutes concerning the

“Conservation Trust Funds” because DNREC failed to obtain an Act of the General

Assembly before signing the DNREC-MOU and granting the Amended Easement.66

65 7 Del. C. § 7506(6) provides that “[t]he Council shall . . . (6) [a]dvise and consult regarding any change from permanently protected status of open space lands acquired or otherwise protected.” The operation of the statute in circumstances closely related to those present here is discussed in Lechliter, 2015 WL 7720277. 66 Additionally, the Plaintiff points to 30 Del. C. § 5423(c)(2), which requires that, “[i]f the General Assembly approved the sale of any project or portion thereof, the State shall receive its pro rata share of net sale income.” Therefore, Plaintiff argues that the section only “authorizes the sale . . . of the protected, public trust Open Space, not the exchange for other land stipulated in the

21

The Plaintiff points to 30 Del. C. § 5423 which states, in part, the following:

It is intended that property acquired with funds from the Endowment Account shall remain in public outdoor recreation and conservation use in perpetuity. Said property may not be converted to other uses without a subsequent act of the General Assembly.67

The Plaintiff alleges that DNREC was required to obtain an act of the General

Assembly pursuant to Section 5423 because the DNREC-MOU and the Amended

Easement converted the use of the Encumbered Land. Furthermore, the Plaintiff

argues that due to this statutory violation68 by DNREC, he has suffered “tort

damages,” presumably injury to his health and property values.

Finally, the Plaintiff argues that DNREC violated Delaware Code Chapter 94,

titled “Real Property Distributions,” because DNREC failed to follow the statutory

procedures that are required to declare property surplus. The Plaintiff points to three

provisions within that Chapter. First, the statute provides that the “Commission on

[DNREC-MOU] or the granting of an easement for the use of land bought with Project Account funds.” Pl.’s Answering Br. 45. 67 30 Del. C. § 5423(c)(2) (emphasis added). 68 Because I find that the Plaintiff lacks standing, I need not reach DNREC’s assertion that it did comply with Section 5423, pointing to the actions of the General Assembly in the 2011 and 2012 Bond Bills. The Plaintiff attacks the 2011 and 2012 Bond Bills on at least two grounds. First, the Plaintiff asserts that 30 Del. C. § 5423(c)(2) requires an Act of the General Assembly before converting the use of land and that the Bond Bills were approved after DNREC signed the DNREC-MOU and granted the Amended Easement—an argument, I note, that is inconsistent with the language of the statute itself, which requires a “subsequent” Act of the General Assembly. In addition, the Plaintiff asserts that the 2011 and 2012 Bond Bill cannot satisfy the requirement of Section 5423 because the General Assembly “circumvented the normal legislative process” by inserting mere “epilogue language,” which cannot serve as an “Act of the General Assembly.” Moreover, the Plaintiff argues that the Bond Bills failed to indicate that its authorization was to remain effective beyond the fiscal year enacted.

22

State Surplus Real Property” is tasked with determining how to utilize land that has

been designated as surplus.69 This commission must review a proposed conveyance

of real property before it can be “sold, leased, transferred or otherwise conveyed.”70

Second, the statute states that “the granting of an easement shall not be considered a

conveyance of real property,” but provides that “[t]he determination to grant an

easement shall be at the discretion of the Director of the Office of Management and

Budget.”71 Finally, the statute contains a special requirement for parcels of land

designated as State parks and open space:

Notwithstanding any provision of this chapter to the contrary, no state park, or any part thereof, open space as defined in § 7504 of Title 7 or other area acquired primarily for recreational use, shall be rezoned, neither shall there be a change in the use of any such lands requiring a variance or subdivision approval, except upon 45 days prior notice to all elected members of the General Assembly in whose district such lands, or any part thereof, lie.72

The Plaintiff alleges that DNREC violated the statute because, before signing the

DNREC-MOU, it failed to (1) properly designate the Encumbered Land as surplus,

and (2) notify the members of the General Assembly in whose district the

Encumbered Land lies. Additionally, the Plaintiff alleges that DNREC improperly

granted the Amended Easement because it failed to seek the discretion of the

69 See 29 Del. C. § 9405. 70 See id. at § 9403. 71 See id. at § 9403. 72 Id. at § 9406.

23

Director of the Office of Management and Budget. The Plaintiff again argues that

he suffered “tort damages” as a result of these statutory violations.

The syllogism advanced by the Plaintiff, as I understand it, runs thus: the

Defendants failed to clear certain procedural hurdles required to lawfully build the

Turbine, and if the Turbine had not been built, it would not emit sounds or create the

flicker effect, and it is those emissions that have injured him. Thus, he has suffered

an injury-in-fact and has standing to litigate the violations of statute. This analysis,

however, is fatally flawed.

First, the injury complained of is not sufficiently related to the statutory

breaches to amount to an injury-in-fact for standing purposes. The Plaintiff has not

alleged, nor could he, that the Defendants could not have cleared the hurdles he

alleges they wrongfully refused to try. There is nothing in the record to show that

the failure of DNREC to consult with the OSC, for instance, which failure the

Plaintiff alleges violated the DLP Act, would have resulted in the OSC

recommending against the Turbine; or that DNREC would have followed such a

recommendation, which would have been purely precatory. Thus, the relationship

between any violation and the damage alleged is insufficiently concrete to afford

standing here.

More fundamentally, the Plaintiff’s injuries are not in the zone of interest

addressed by any of the statutes he cites. The DLP Act seeks to preserve open space

24

and protect the environment. The same is true of 30 Del. C. § 5423. Finally, 29 Del.

Code §§ 9401 et seq. is intended to protect the property interests of the State of

Delaware, as well as to preserve open space. The fact that violations of these statutes

led to construction of a windmill, emanations from which subsequently injured the

Plaintiff, is a mere fortuity; none of the statutes cited had the intent of preventing the

harm the Plaintiff has allegedly suffered, and his injuries, therefore, are outside the

zone of interests protected thereby. The Plaintiff, if he has suffered an injury, may

pursue his damages in tort, but lacks standing to vindicate the statutory violations of

which he complains.73

2. Taxpayer Standing

The Plaintiff argues that he has taxpayer standing to challenge the Original

Easement and Amended Easement. In Delaware, taxpayer standing is “reserved for

a narrow set of claims involving challenges either to expenditure of public funds or

use of public lands.”74 It provides a plaintiff–taxpayer standing regardless of any

73 I note that in Count I of the Complaint, the Plaintiff alleges that DNREC also violated portions of the Coastal Zoning Act because it “never submitted plans for the Turbine to a pre-construction Status Decision.” Compl. ¶ 236; 7 Del. C. §§ 7001–13. It is unclear to me whether the Plaintiff has continued to support this claim in his answering brief or at oral argument. To the extent that the Plaintiff has not waived this claim, he lacks standing for the same reasons stated above: he has not sufficiently alleged a concrete injury-in-fact, nor does his alleged injury fall within the zone of interest addressed by the Coastal Zoning Act. The Coastal Zoning Act was designed to protect the State’s natural environment and not to prevent “tort damages” as alleged by the Plaintiff here. 74 Reeder v. Wagner, 974 A.2d 858, at *2 (Del. 2009) (citing O’neil, 2006 WL 4804652 at *20).

25

showing of special damages.75

Here, the Plaintiff argues that he has taxpayer standing because the grants of

the Original Easement and Amended Easement represent both a “misuse of taxpayer

dollars” and a “misuse of public land.”76 I have already concluded that the Plaintiff’s

claims concerning the Original Easement are barred by laches. To the extent the

Plaintiff alleges that the Amended Easement represents a misuse of public funds, his

argument is unavailing because DNREC did not expend any funds, of any kind,

when it agreed to amend the easement.

That leaves the Plaintiff’s claim that the Amended Easement is a misuse of

public land. The foundational case for taxpayer standing regarding publicly-owned

real property is City of Wilmington v. Lord.77 In Lord, a group of taxpayers

challenged the erection of a water tank on city-owned land that had been previously

designated to be used for public park purposes.78 The plaintiff–taxpayers argued

that the construction of a water tank was illegal because it did not conform to the

75 Danvir Corp. v. City of Wilmington, 2008 WL 4560903, at *3 (Del. Ch. Oct. 6, 2008) (citation omitted). 76 DNREC argues that the Plaintiff failed to allege taxpayer standing in his Complaint. However, I note that the Plaintiff broadly asserted in Count I of his Complaint that “Defendant DNREC and UD-related defendants’ actions are a misuse of public land.” Compl. ¶ 240. 77 378 A.2d 365 (Del. 1977). 78 Specifically, the parcel of land had been donated to the city using a deed that included an express condition that the land be used for public park purposes. Id. at 637. Furthermore, to receive the land, the city acted pursuant to a statute that gave it the authority to acquire real property “for the purpose of providing and maintaining one or more open places or parks.” Id. After being used for many years as a golf course, the city proposed building a water tank on the land. Id.

26

land’s designated purpose and would thus violate the public trust; in response, the

city argued that the plaintiffs did not have standing to bring the claim.79 To address

the issue of standing, the Court noted that a taxpayer has a “sufficient stake” in the

proper use of tax receipts to “allow him to challenge improper uses of tax funds.”80

Recognizing that the plaintiffs in that case had challenged, not the use of funds, but

the use of property, the Court extended taxpayer standing to encompass a challenge

to the use of real property:

The improper use of publicly held real property is sufficiently analogous to the improper use of public money so that if a taxpayer has a legal right to sue in the latter case, then necessarily a taxpayer should have a similar right in the former case.81

Accordingly, the Court held that “where a property is held under an express trust for

public park purposes, a taxpayer has standing to sue to enjoin an alleged violation of

that trust.”82 In this case, the Plaintiff asserts that the Amended Easement permits

certain uses of the Encumbered Land that “fail to conform to the statutory covenants

for the use of protected, public trust open space listed in the DLP Act.”83 This

allegation is sufficient to obtain taxpayer standing under the standard articulated in

Lord. The Plaintiff alleges that a parcel of land is held in the public trust and has

been designated as open space, thereby limiting the use of the land. Furthermore,

79 Id. 80 Id. 81 Id. at 638 (citations omitted). 82 Id. at 640. 83 Pl.’s Answering Br. 34.

27

the Plaintiff argues that the Amended Easement allows the University to use the

parcel for uses other than those permitted by statute, namely, the building of the

Turbine. Therefore, I find that the Plaintiff has taxpayer standing to challenge the

Amended Easement, and address the substance of these allegations next.

3. The Amended Easement as a Misuse of Public Property

I have already described the statutory violations that the Plaintiff alleges to

establish his claim that the Amended Easement was a misuse of public property. In

sum, the Plaintiff argues that there are various statutes to which DNREC failed to

adhere in amending the Original Easement and creating the Amended Easement,

because that amendment resulted in a change of the status of the land from DLP Act

protected open space.

DNREC contends, and I agree, that the Plaintiff’s challenge to the Amended

Easement must be dismissed because it is based on the “false premise” that the

Encumbered Land was once state-owned, permanently protected open space under

the DLP Act,84 unencumbered by the private rights embodied in the easement. The

Plaintiff argues that the entirety of the Lewes Property became protected open space

upon DNREC’s purchase, thus assuming that there was a moment in time, between

84 This analysis deals with the Plaintiff’s arguments that the Easements wrongfully converted property purchased under the DLP Act from protected open space to the private use of the University and its affiliates. It should not be confused with the Plaintiff’s allegations that the Turbine violates the City’s zoning code because the Lewes Property is zoned “Open Space.” See infra Section IV.C.

28

the purchase of the Lewes Property and the grant of the Original Easement, where

the Encumbered Land was subject to the restrictions on development in the DLP

Act. However, the Original Easement was explicitly included as consideration for

the purchase of the Lewes property; in fact, the grant and the purchase were virtually

simultaneous. Consequently, I deem the purchase and the grant a single,

simultaneous transaction. The Encumbered Land, therefore, was never DLP Act

protected open space, unencumbered by a right of private usage in favor of the

University. The Encumbered Land was purchased from UD without the right to

exclude UD: it was, and remained, land subject to the deposition of dredge spoils by

the University. In light of this fact, DNREC’s subsequent amendment to the Original

Easement likewise could not have converted the Encumbered Land from public open

space to land subject to private use, since the Encumbered Land was reserved, in any

event, to the use of the University as a spoils ground.85

85 In addition, the Plaintiff alleges that the Amended Easement added acreage to the Original Easement. Pl.’s Answering Br. 18. If the additional acreage was originally protected open space, and if the record indicated that that acreage was now occupied by the Turbine, then the Plaintiff might be able to show that DNREC illegally converted the additional acreage from protected open space. However, the Plaintiff has failed to support this claim. According to the terms of the Amended Easement, the only purpose of the amendment is to “clarify the ability of [UD] to utilize the Area for its purposes”; the terms do no mention additional acreage. See Compl., Ex. 10 (Amended Easement). The Plaintiff’s only evidence for his contention that the Amended Easement included additional land not subject to the Original Easment is an email that he received in response to a FOIA request. That email was authored by the Manager of the Land Preservation Office, a Division of Parks and Recreation. In it, the Manager states that the Amended Easement increased the Encumbered Land by 1.4 acres. Id., Ex. 28 (Email). The Plaintiff, however does not allege or point to record evidence that the Turbine is located outside the Original Easement, and I note that the terms of the Amended Easement do not purport to extend the burdened area.

29

4. The University’s Violation of the Amended Easement

In Count I, the Plaintiff also alleges that the University violated the terms of the

Amended Easement by allowing First State, a “third-party, for-profit LLC” to sell

electricity generated by the Turbine.86 According to the Plaintiff, the Amended

Easement prohibits “commercial uses” and, otherwise, does not contemplate that

First State would operate the Turbine.87 In response, the Defendants contend that

the Plaintiff lacks standing to enforce the Amended Easement because the Plaintiff

was not a party to the agreement. The Plaintiff did not attempt to establish standing

to enforce the terms of the Amended Easement in his answering brief or at oral

argument and, therefore, the Plaintiff’s claim is waived.88

Based on the foregoing, I grant summary judgment in favor of the Defendants

for all of the Plaintiff’s claims in Count I.89

Therefore I conclude that the email, whatever its evidentiary value, does not create an evidentiary issue for trial. 86 Pl.’s Answering Br. 16. 87 Id. 88 See In re Crimson Exploration Inc. S’holder Litig., 2014 WL 5449419, at *26 (Del. Ch. Oct. 24, 2014) (waiving the plaintiffs’ claim where they “did not mention [the claim] in their Opposition Brief or at the Argument”) (citing Emerald Partners v. Berlin, 2003 WL 21003437, at *43 (Del. Ch. Apr. 28, 2003) (“It is settled Delaware law that a party waives an argument by not including it in his brief.”)). 89 I note that the Defendants argue that all of the Plaintiff’s allegations have been cured by “legislative fiat” through the 2011 and 2012 Bond Bills. In response, the Plaintiff argues that the bills merely contemplate the sale of the land and are, otherwise, silent as to the easements. Additionally, the Plaintiff questions whether the bills’ authorizations, if any, extend beyond their fiscal year. I need not consider the relevance of the Bond Bills to the facts here because I have already dismissed the Plaintiff’s claims on other grounds.

30

C. Claims Against the City for Approving the City-MOA and Granting the Building Permit

In Count II of his Complaint, the Plaintiff challenges the process by which the

City approved the construction of the Turbine, asserting claims against the City and

the UD Defendants.90 As a result of these process violations, the Plaintiff argues

that the City-MOA and Building Permit are “legal nullities.”91

The Plaintiff alleges that the City-MOA “effectively rezoned the

[Encumbered Land] from Open Space in the 2005 Comp Plan to University without

following proper procedures.”92 In other words, to the extent the City-MOA

indicates any zoning status other than “Open Space,” the City-MOA would have

effectively, but improperly, rezoned the Encumbered Land from “Open Space” to a

new status: “University.”93 To support this claim, the Plaintiff asserts that the

City-MOA incorrectly indicates that the Encumbered Land is zoned as “University,”

90 In this section, I consider only the claims against the City, individually. The Plaintiff’s related conspiracy claims are analyzed together and discussed elsewhere. 91 Pl.’s Answering Br. 72. In addition, the Plaintiff alleges for the first time in his answering brief that the City-MOA was breached. Id. at 24. According to the Plaintiff, the City-MOA “preclude[d] any commercial activity without prior written consent of the City.” Id. However, the Plaintiff argues that First State—a for-profit entity—was allowed to conduct “commercial activity” without obtaining consent in accordance with the MOA. Id. To the extent this is an attempt to state a claim, raised for the first time in a brief in opposition to Motions to Dismiss and for Summary Judgment, it is untimely, and I have not considered it here. 92 Id. at 8. This argument regarding the zoning of the Lewes Property as “Open Space” should not be confused with Plaintiff’s argument that certain restrictions applied to the Encumbered Land because it was acquired as protected open space under the DLP Act, addressed above. 93 See id. 9. The Plaintiff refers to an email from then-Mayor Ford in which Ford stated that if any land ownership was transferred, the zoning of the land would change from “Open Space” to “University.” See Comp., Ex. 61 (Email), at 366.

31

and therefore, per the Plaintiff, the City-MOA improperly effects a “rezoning” of the

Encumbered Land.

I find the Plaintiff’s rationale hard to follow. As the Defendants point out, the

City-MOA contains a simple inaccuracy: the City-MOA mistakenly indicates that

the Encumbered Land was zoned “University” when it was actually zoned as “Open

Space.” The Plaintiff has failed to show how this inaccuracy caused the Plaintiff an

injury or is otherwise actionable.

The Plaintiff also challenges the issuance of the Building Permit for the

Turbine by the City. First, he argues that if the City-MOA did not effectively rezone

the Encumbered Land, the University would have had to request that the parcel be

rezoned before receiving a Building Permit for the Turbine, which it failed to do.94

Second, the Plaintiff asserts that the Building Permit was improperly issued because

the fee assessed in conjunction with the permit was “greatly reduced.”95 According

to the Plaintiff, the Building Permit application improperly excluded the costs of the

Turbine itself and only accounted for the construction costs of the tower on which it

is located, thus significantly, and improperly, reducing the Building Permit fee.96

94 Pl.’s Answering Br. 70. 95 Id. at 9. The Plaintiff also appears to challenge the height variance that was allegedly granted in order to obtain the building permit. The Plaintiff has failed to specifically articulate a claim regarding the City’s decision to exempt the Turbine from any height restrictions, other than to allege that documentation of the City’s decision was not provided to him in any City FOIA responses. See id. at 24. 96 See id. at 26–27. Plaintiff alleges the excluded costs of the Turbine were approximately $3,000,000. See id.

32

Finally, the Plaintiff alleges that the Building Permit application inaccurately stated

that UD owned the property.97

The Plaintiff’s challenge to the issuance of the Building Permit is fatally

untimely. The City Building Code provides that an appeal may be taken to the Board

of Building Code Appeals “by any person aggrieved by a decision of the Building

Official” within 20 days.98 In response, the Plaintiff argues that appealing to the

Board of Building Code Appeals would have been “futile,” but fails to indicate why

this is so. The permit was exercised and the Turbine was constructed over two years

before the Plaintiff filed his Complaint. Having eschewed his right under the Code

to seek redress, the Plaintiff is barred by laches from litigating the matter here.

D. FOIA Claims Against DNREC and the City

The Plaintiff alleges in Counts III and IV that both DNREC and the City

violated the Delaware FOIA.99 In Count III, the Plaintiff alleges that DNREC

violated the Open Meeting provisions of the Delaware FOIA because (1) DNREC

did not publish an agenda for the public meeting of the OSC on June 6, 2012; (2)

DNREC employees discussed an unauthorized topic during an executive session at

that OSC meeting; and (3) DNREC published an agenda for the public meeting of

97 Id. at 27–28. 98 70 Lewes Code § 70-60. 99 29 Del. C. §§ 10001–07.

33

the OSC on September 16, 2012 that did not meet the specificity requirements.100

DNREC argues that this FOIA claim should be dismissed because DNREC is not

the proper party for the Plaintiff’s claim. According to DNREC, the OSC is a

separate entity, created by statute, and DNREC merely supports the OSC. Moreover,

DNREC argues that it has no authority over the OSC, which, DNREC argues, is the

proper subject of the Plaintiff’s FOIA claims. The Plaintiff did not respond to

DNREC’s argument in his answering brief and, as a result, the Plaintiff has waived

the FOIA claim in Count III. Therefore, I grant summary judgment in favor of the

Defendants as to Count III.

In Count IV, the Plaintiff alleges that “City Council has flagrantly and

consistently violated provisions of the FOIA.”101 The Plaintiff’s only support for

this allegation is to incorporate by reference “all allegations set forth” in his

Complaint.102 The Defendants argue that the Plaintiff’s allegations are “conclusory

allegations that may be ignored on a motion for summary judgment.”103 Moreover,

the Defendants assert that any FOIA violations related to the Turbine are time

barred, alluding to the untimely allegations asserted in Count II. In Count II, the

Plaintiff asserts various allegations against the City regarding the January 2010 City

100 Compl. ¶ 270. 101 Id. at ¶ 272. 102 Id. at ¶ 271. 103 Defs. City/UD’s Opening Br. 14.

34

Council meeting. The Plaintiff alleges that the agenda published for the January

2010 public meeting failed to give the public proper notice that City Council was

going to vote on its approval of the City-MOA.104 According to the Plaintiff, the

agenda merely disclosed that the City-MOA was going to be “discussed” and

“considered.”105 In addition, the Plaintiff challenges the executive session that was

held during that City Council meeting. According to the Plaintiff, the City-MOA

was discussed during the executive session despite the fact that neither the agenda

nor the minutes of the meeting included the City-MOA as a topic.106 According to

the Plaintiff, the City’s failure to properly notify its citizens that it intended to vote

on approving the City-MOA was a violation of his procedural due process rights.107

The City argues, and I agree, that these allegations are more accurately characterized

as violations of the open meetings provision of the FOIA.108 The FOIA includes

express time limitations, which state, in part, the following:

Any citizen may challenge the validity . . . of any action of a public body by filing suit within 60 days of the citizen’s learning of such action but in no event later than 6 months after the date of the action.109

The Plaintiff filed his complaint on October 11, 2012, well beyond the FOIA’s six

month statute of repose. Therefore, I find that the Plaintiff’s failure to contest the

104 Pl.’s Answering Br. 21. 105 Id. at 21. 106 Id. at 22. 107 Id. at 70. 108 See 29 Del. C. § 10004. 109 Id. at § 10005(a).

35

alleged FOIA infractions within six months amounts to laches, by analogy to the

statute of repose, and grant summary judgment in favor of the Defendants for the

FOIA claims embedded in Count II.

In the Plaintiff’s answering brief, he concedes that most of the FOIA claims

alleged against the City are time-barred; however, the Plaintiff argues that he has

properly alleged “FOIA claims that fall with[in] the six-month statutory period for

filing a complaint,” citing paragraphs 220 through 232 of his Complaint.110 These

paragraphs were not originally cited in Count IV of the Complaint, however. After

reviewing the paragraphs identified in the Plaintiff’s answering brief, it appears that

he alleges FOIA violations resulting from various City meetings between June and

September 2012.111 However, the topics in the meetings were wholly unrelated to

the Turbine,112 and the Plaintiff has not sought relief for allegations related to these

meetings, beyond a blanket request that I enter a declaratory judgment that the

meetings were “illegal.” But invoking the Declaratory Judgment Act,113 without an

actual controversy, does not confer jurisdiction on this Court.114 An actual

controversy involves redress of a disputed right on the part of the complainant, where

the dispute is actual, ripe, and adverse between the parties.115 As such, the Plaintiff

110 Pl.’s Answering Br. 77. 111 Compl. ¶ 220–32. 112 Id. at ¶ 222. 113 See 10 Del. C. §§ 6501–13. 114 E.g., Rollins Int’l, Inc. v. Int’l Hydronics Corp., 303 A.2d 660, 662–63 (Del. 1973). 115 Id.

36

has failed to state a claim with respect to violations of FOIA involving the 2012

meetings.

E. Claims Against DNREC for Allowing Certain Persons to Hunt the Property

In Count V, the Plaintiff accuses DNREC of “allow[ing] selected individuals

to hunt illegally on State-owned Open Space Park land.” The Plaintiff concedes that

DNREC has the authority to regulate hunting in State parks,116 but argues that “the

gravamen of this claim is that DNREC allowed only select individuals to hunt in this

area.”117 According to the Plaintiff, “[i]f hunting is to be allowed in this area, all

citizens should have the same rights.”118 However, the Plaintiff does not allege that

he has sought and been denied a right to hunt these lands; he is a mere intermeddler

who seeks a declaration without a corresponding interest or injury. He is without

standing; therefore, I grant summary judgment in favor of the Defendants in Count

V.119

116 Pl.’s Answering Br. 56. Both the Plaintiff and DNREC cite 7 Del. C. § 4701(d), which provides: All state parks and other areas acquired primarily for recreational use shall, from the date of their establishment as such, come under the jurisdiction of the Department of Natural Resources and Environmental Control and shall be closed to hunting, except in areas designated by the Department of Natural Resources and Environmental Control for such purpose. 117 Pl.’s Answering Br. 57 (emphasis added). 118 Id. at 57. 119 The Plaintiff alleges for the first time in his answering brief that this supposed illegal hunting occurs in close proximity to his residence and in an area through which he regularly walks, thus creating a hazard and a nuisance. Id. at 57. However, as the Plaintiff did not raise this allegation in his Complaint and points to no record evidence in support, I do not consider these allegations here.

37

F. Tort Claims Against All Defendants

In Counts VI and VII, the Plaintiff alleges eight tort claims: (1) private

nuisance,120 (2) negligent infliction of emotional distress, (3) public nuisance, (4)

negligence per se, (5) negligence, (6) fraudulent misrepresentation, (7) negligent

misrepresentation, and (8) civil conspiracy. The Plaintiff brings each tort claim

against all of the Defendants “under the concert of action and civil conspiracy

doctrines.” I address each tort claim below.

1. Private Nuisance and Public Nuisance

A private nuisance is “a nontrespassory invasion of another's interest in the

private use and enjoyment of land.”121 “[A]ll those who participate in creating the

nuisance may be liable to third parties who suffer as a result.”122

The Plaintiff alleges that the Turbine—one-half mile distant from his

property—produces “disturbing noises, flashing red light, strobe/shadow effect and

unreasonable interference with [his] use and enjoyment of his property, including

sleep deprivation.”123 The Defendants argue that they could not have unreasonably

120 The Plaintiff alleges that the effects of the Turbine have caused both a “private nuisance” and a “continuing private nuisance.” The allegations largely overlap and there is no legal distinction between the Plaintiff’s causes of action. Therefore, I will consider both sets of allegations under the private nuisance tort. 121 Restatement (Second) of Torts § 821D (1979). See also Bechrich Holdings, LLC v. Bishop, 2005 WL 1413305, at *9 (Del. Ch. June 9, 2005) (citing Cunningham v. Wilmington Ice Mfg. Co., 121 A. 654, 654 (Del. Super. 1923) (defining tort of private nuisance). 122 Leitstein v. Hirt, 2006 WL 2986999, at *2 (Del. Ch. Oct. 12, 2006) (citing Keeley v. Manor Park Apartments, 99 A.2d 248, 250 (Del. Ch. 1953)). 123 Compl. ¶ 278.

38

interfered with the Plaintiff’s use and enjoyment of his property, pointing to

affidavits filed in this matter, which embody studies that show that the Turbine

“complies with the [S]tate’s noise regulations;124 that it complies with the City’s

noise and other zoning requirements;125 and, that any ‘flicker’ is limited.”126 The

Plaintiff personally expresses disagreement with these studies,127 but points to no

evidence that he has been harmed by the Defendants’ unreasonable acts. During oral

argument, the Plaintiff argued that it was subliminal long-waive-length sounds and

the pernicious effects on health of the limited flicker effect that have caused him

physical harm and diminished his property value. These are claims that will require

expert testimony to validate.128 Since the Defendants have submitted affidavits

124 The University commissioned a noise study in late 2010 that concluded that even when the Turbine is moving at its maximum speed, it complies with Delaware Noise Regulations. Defs. City/UD’s Opening Br. 16; Aff. of Allison McCowan, Exs. C (Acoustic Study) and D (Sound Compliance Study). 125 The City submitted the affidavit of the Building Official for the City, who stated that the Turbine does not violate the City’s noise ordinance. Aff. of Allison McCowan, Ex. A (Aff. of Henry Baynum), at ¶ 8. 126 The University hired SED to perform a “Shadow Flicker Analysis.” SED concluded that the Turbine would not have any adverse shadow flicker impacts to the surrounding area. Id. at Ex. B (Shadow Flicker Analysis). 127 Compl. ¶ 35; Oral Arg. Tr. 58–60 (Unofficial Transcript). 128 When the issue of causation requires consideration of scientific determinations that are not a matter of common knowledge, the plaintiff has the burden to provide testimony of a competent expert witness. See, e.g., Money v. Manville Corp. Asbestos Disease Comp. Tr. Fund, 596 A.2d 1372, 1377 (Del. 1991) (“The plaintiff has the burden of providing by competent evidence that there was a reasonable probability of a causal connection between each defendant’s negligence and the plaintiff’s injury . . . . When the issue of causation is presented in a context which is not a matter of common knowledge, such a reasonable probability can only be proven by the testimony of a competent expert witness.”) (internal citations omitted). Here, the Plaintiff’s nuisance claim requires many scientific determinations, such as the level of subliminal sound, the frequency of a flicker effect, and the effect of each on his health and property values, all of which are not a matter of common knowledge and thus require testimony of an expert.

39

indicating that the Plaintiff has suffered no cognizable harm, Rule 56 requires the

Plaintiff to point to record evidence of his own showing an issue for trial, or his

claims must be dismissed.129 The Plaintiff can point to nothing in the evidence of

record to substantiate his allegations.

At oral argument, the Plaintiff maintained that he had not understood it was

necessary to provide evidence of harm at this stage of the litigation, but he

represented to the Court that he could provide expert testimony to support his

nuisance claim if given more time. I note that the Plaintiff is representing himself

pro se in this matter and has made allegations that, if true, could lead to relief. Given

these considerations, I find it equitable to give the Plaintiff the opportunity to submit

expert testimony to support his private nuisance claim. Therefore, I will reserve my

decision regarding the Plaintiff’s private nuisance claim for 60 days, within which

time the Plaintiff should submit affidavits and an expert report sufficient to sustain

a finding of nuisance. If the Plaintiff fails to submit additional evidence, I will revisit

the Defendants’ Motion for Summary Judgment as to the private nuisance claim.

The Plaintiff also alleges the Turbine has caused a public nuisance. A public

nuisance is a nuisance that “affects the rights to which every citizen is entitled.”130

129 See Ch. Ct. R. 56(e); see also Winshall v. Viacom Intern. Inc., 2012 WL 6200271, at *8 (Del. Ch. Dec. 12, 2012). 130 Artesian Water Co. v. New Castle Cnty., 1983 WL 17986, at *22 (Del. Ch. Aug. 4, 1983). See also Restatement (Second) of Torts § 821B(1) (1979) (“A public nuisance is an unreasonable interference with a right common to the general public.”).

40

To have standing to bring a public nuisance claim, a private plaintiff must allege a

special harm—that is, a harm “of a kind different from that suffered by other

members of the public.”131

The Plaintiff’s public nuisance claim suffers the same shortcoming as does his

private nuisance claim: he has failed thus far to present any scientific evidence that

links his complaints of special injury—physical and property damage—to the

operation of the Turbine. Assuming he does so in the time I have allotted him, he

will have met the requirement of special injury. The infringement of a public right

he alleges is that the Turbine presents a safety hazard to the public using the

Connector Road, an allegation that awaits factual development. For the reasons

stated above, I reserve decision on the Defendants Motion for Summary Judgement

with respect to the public nuisance claim for 60 days, during which time the Plaintiff

may supplement the record with affidavits and an expert report.

2. Negligence Per Se

The Plaintiff alleges that the Defendants have damaged him, and are negligent

per se. To establish negligence per se, a plaintiff must first demonstrate that the

defendant committed a “violation of a Delaware statute enacted for the safety of

131 Artesian Water Co., 1983 WL 17986 at * 22. See also Restatement (Second) of Torts § 821C (1979) (“In order to recover damages in an individual action for a public nuisance, one must have suffered harm of a kind different from that suffered by other members of the public . . . .”).

41

others.”132 Second, the plaintiff must demonstrate that the defendant’s violation

proximately caused his injury.

Here, the Plaintiff alleges that the Defendants violated the City’s Comp Plan

and the DLP Act by constructing the Turbine at its present location.133 The Plaintiff

has not alleged that the DLP Act was “enacted for the safety of others,”—clearly, it

was not—and therefore fails to establish negligence per se. The Plaintiff’s

Complaint indicates that “[t]he City Code has Zoning regulations, the purpose of

which are promoting public health, safety, morals, and general welfare of the City

of Lewes”;134 but this is simply the general foundation upon which all statutes and

regulations exist—a set of zoning regulations do not amount to regulation enacted

expressly in aid of citizens’ safety. Finally, Plaintiff asserts that the UD Defendants

“violated the State’s Noise Statute and City’s Noise Ordinance.”135 Again, there is

no indication that these ordinances were enacted to protect the safety of the public.

Summary judgement is therefore entered on the claims of negligence per se.

3. Negligence

The Plaintiff alleges that the Defendants were negligent in locating the

Turbine. To establish negligence, a plaintiff must show that the defendant owed the

132 Duphily v. Delaware Electric Co-Op, Inc., 622 A.2d 821, 828 (Del. 1995) (citations omitted). 133 Pl.’s Answering Br. 81. 134 Compl. ¶ 136. 135 Pl.’s Answering Br. 81.

42

plaintiff a duty; that the defendant breached that duty; and that the defendant’s

breach proximately caused an injury to the plaintiff.136

The Plaintiff alleges that “UD owed a duty to Lechliter to locate and operate

the Turbine with reasonable care because it knew, or should have known, the Turbine

would affect residents whose homes are in close proximity to it with nuisance noise,

flicker, and even vibration.”137 The Defendants argue that this duty equates to the

general duty of an adjacent landowner—which is already accounted for in the

Plaintiff’s private nuisance claim—and that the Plaintiff must cite a separate duty on

which to base his nuisance claim.138 The Defendants fail to cite a legal basis for this

assertion, however. I note that the Defendants have not asserted that the regulatory

process by which they obtained a permit for the Turbine precludes this claim, and I

do not consider that argument here.

The Plaintiff has alleged that UD owes the Plaintiff a duty of reasonable care

to locate the Turbine so as to not damage neighboring property, which duty it

breached, and that Plaintiff has suffered damages thereby. While the Defendants are

correct that the Plaintiff may not recover damages for the same injuries under

separate theories of nuisance and negligence, they are not entitled to summary

judgment on this record. However, I reserve decision on these claims for the same

136 See Culver v. Bennett, 588 A.2d 1094, 1096–97 (Del. 1991) (citations omitted). 137 Compl. ¶ 65. 138 Defs. City/UD’s Reply 15.

43

reason as with the nuisance claims—the Plaintiff must in 60 days supplement the

record to show injury, or face summary judgement.

Finally, in Count VII, the Plaintiff attempts to state another negligence claim:

he asserts that by locating the Connector Road too close to the Turbine, DNREC and

UD acted “with gross and wanton negligence” in creating “a public safety hazard for

citizens by approving UD’s realignment of the Connector Road.”139 The tort of

negligence cannot address a prospective public injury, and the defendant has failed

to point to (or even allege) any injury he has suffered due to the construction or

location of the road. I grant the Defendants’ Motion for Summary Judgment with

respect to Count VII.

4. Fraudulent Misrepresentation

The Plaintiff asserts numerous claims of fraudulent misrepresentation. In

order to establish a claim for fraudulent misrepresentation, a plaintiff must show: (1)

that the defendant made a false representation of a material fact to the plaintiff; (2)

that the defendant must have knowledge of the falsity of the representation, while

the plaintiff must be ignorant of the falsity; (3) that the misrepresentation was made

with the intent that the plaintiff would believe it to be true, act in reliance thereon,

and be deceived thereby; and (4) that the plaintiff actually did so believe, act, and

139 Compl. 68. The Connector Road was constructed after the Turbine was up and operating.

44

was deceived, as well as having been harmed thereby.140

The Plaintiff asserts that “UD never informed the public about any problems

associated with Turbines,” and, instead, presented the Turbine as “[g]reen [e]nergy,

the wave of the future, and completely benign.”141 In addition, the Plaintiff alleges

that UD “misrepresented the zoning for the parcel” on which the Turbine was

constructed—apparently an allegation relating to the indication in the City-MOA

that the property was zoned “University.”142 According to the Plaintiff, “[i]f the land

use of ‘Open Space’ in the Comp Plan had been applied to the parcel, the Turbine

never would have been built at this location without a public hearing.”143 Overall,

the Plaintiff alleges that he relied on UD’s misrepresentations of the zoning of the

Encumbered Land and, as a result, he failed to oppose the Turbine prior to

construction.144 Moreover, had the Plaintiff known about the “problems associated

with [t]urbines,” he would have “taken action to prevent UD from building its

Turbine.”145

The Plaintiff has not, and cannot, allege that he was harmed by the

misrepresentation of the Defendants, if any. His contention that he would have

140 See Brzoska v. Olson, 668 A.2d 1355, 1366 (Del. 1995) (citing Twin Coach Co. v. Chance Vought Aircraft, Inc., 163 A.2d 278, 284 (Del. 1960) (citations omitted)). 141 Pl.’s Answering Br. 84 (quotations omitted). 142 Id. at 85. 143 Id. at 86. 144 Id. at 87. 145 Id.

45

“taken action” does not amount to an allegation that he could have blocked the

construction of the Turbine, and he cannot, therefore, demonstrate that he has been

harmed by any statements of UD. With respect to his claims that UD should have

provided him additional negative information about wind turbines in general, the

failure to inform without more is not actionable misrepresentation. In effect, the

misrepresentation claims are merely an attempt to repackage his stale FOIA and

process arguments. I grant the Defendants’ Motion for Summary Judgment as to the

Plaintiff’s claim for fraudulent misrepresentation.

5. Negligent Misrepresentation

In the Plaintiff’s Complaint, he asserts that he “meets the minimal

requirements for this tort claim.”146 The Defendants correctly point out that the

Plaintiff’s claim must fail because he does not allege that the Defendants owed a

“pecuniary duty” to provide accurate information to the Plaintiff—a necessary

element of negligent misrepresentation.147 Therefore, I grant the Motion for

Summary Judgment in favor of the Defendants on this claim.

6. Civil Conspiracy

The Plaintiff’s Complaint contains multiple allegations of conspiracy, all of

which I address in this section. To state a claim for civil conspiracy under Delaware

146 Compl. ¶ 307. 147 See Corp. Prop. Assocs. 14 Inc. v. CHR Holding Corp., 2008 WL 963048, at *8 (Del. Ch. Apr. 10, 2008).

46

law, a plaintiff must plead facts supporting “(1) the existence of a confederation or

combination of two or more persons; (2) that an unlawful act was done in furtherance

of the conspiracy; and (3) that the conspirators caused actual damage to the

plaintiff.”148 In Count I of the Complaint, the Plaintiff alleges that

Defendants DNREC, UD, Gamesa, Blue Hen, and First State conspired to build the Turbine illegally on state-owned Open Space in violation of the [DLP] Act at 7 Del. C. § 7501 et seq.; 29 Del. C., chapter 94, “Real Property Disposition”; 30 Del. C. 5423(c)(2); and the Delaware Coastal Zone Act and Regulations.149

Similarly, in Count II of the Complaint, the Plaintiff alleges the following:

The City and [UD Defendants] conspired to violate the City’s October 2005 Comp Plan and 22 Del. C. § 702(d), to misrepresent material facts to the detriment of City taxpayers; to issue an illegal Building Permit; [and] to defraud the City treasury of funds it is due by law.150

As the result of my decision above, none of the Plaintiff’s individual

allegations in Count I or II survive. Therefore, the Plaintiff’s related

conspiracy claims must fail because the Plaintiff has not alleged a surviving

148 Allied Capital Corp. v. GC-Sun Holdings, L.P., 910 A.2d 1020, 1036 (Del. Ch. Nov. 22, 2006) (citing Nicolet, Inc. v. Nutt, 525 A.2d 146, 149–50 (Del. 1987)). 149 Compl. 56. The Plaintiff simplified this claim in his answering brief by alleging that “UD conspired with State and City officials to allow the construction of the Turbine in violation of the [DLP] Act.” Pl.’s Answering Br. 92. 150 Compl. 58. The Plaintiff simplified this claim in his answering brief by alleging that “UD conspired with State and City officials to allow the construction of the Turbine in violation of . . . the City’s Comp. Plan . . . . The claim also applies to the City and UD’s handling of the Building Permit.” Pl.’s Answering Br. 92.

47

substantive cause of action on which to base his claims.151

Finally, in Count IV of the Complaint, the Plaintiff asserts that his

“claim of fraud readily meets the requirement for an underlying wrong.” It is

unclear whether the Plaintiff alleges a fraud in relation to his allegations in

Counts I and II, or if he alleges a separate count for fraud. I have already

rejected the Plaintiff’s allegations in Counts I and II, and to the extent the

Plaintiff attempts to rely on a separate allegation of fraud, he has failed to state

a claim for fraud with particularity.152 Therefore, I grant summary judgment

in favor of the Defendants as to all of the Plaintiff’s conspiracy claims.
Outcome:
The Complaint pleads tort claims that will require expert testimony to

withstand summary judgment, barnacled with improperly alleged or stale process

claims. Based on the foregoing, I grant summary judgment in favor of the

Defendants on all of the Plaintiff’s claims, except for certain of the Plaintiff’s tort

claims alleged in Count VI, upon which I reserve decision pending the Plaintiff’s

submission of expert opinion. The Defendants should present an appropriate form

of order.

Plaintiff's Experts:
Defendant's Experts:
Comments:

About This Case

What was the outcome of Gerald A. Lechliter v. Del. Department of Natural Resourc...?

The outcome was: The Complaint pleads tort claims that will require expert testimony to withstand summary judgment, barnacled with improperly alleged or stale process claims. Based on the foregoing, I grant summary judgment in favor of the Defendants on all of the Plaintiff’s claims, except for certain of the Plaintiff’s tort claims alleged in Count VI, upon which I reserve decision pending the Plaintiff’s submission of expert opinion. The Defendants should present an appropriate form of order.

Which court heard Gerald A. Lechliter v. Del. Department of Natural Resourc...?

This case was heard in IN THE COURT OF CHANCERY OF THE STATE OF DELAWARE, DE. The presiding judge was Sam Glasscock III.

Who were the attorneys in Gerald A. Lechliter v. Del. Department of Natural Resourc...?

Plaintiff's attorney: Dan McKenty, Mike Mitchell. Defendant's attorney: Ralph K. Durstein, III, Devera B. Scott, William J. Kassab.

When was Gerald A. Lechliter v. Del. Department of Natural Resourc... decided?

This case was decided on January 1, 2016.